Monday, October 14, 2013

Sovereign Wealth Fund «Samruk-Kazyna» JSC Subsidiary Companies

You will enjoy this post. In one page you have details, with contacts and names of all SK subsidiary companies. 

If you need any details on who is who and about the decision process, let me know. 

Oil & Gaz
·      JSC National Company "KazMunayGas"
Lyazzat Kiinov,
Chairman of the Management Board
Tel./ Fax: + 7 (7172) 976063 /51 70 21 Web-site: www.kmg.kz
Mining
·      National mining company “Tau-Ken Samruk” JSC
Mazhyt Turmagambetov, Chairman of the Management Board
Tel: +7 (7172) 552780, 559572 Web-site: www.tks.kz
Energy
·      JSC "Samruk-Energy"
Almasadam Satkaliev,
Chairman of the Management Board
Tel./ Fax: + 7 (7172) 55-30-21/ 55-30-30 Web-site: www.samruk-energy.kz
·      JSC «KEGOC»
Bakhytzhan Kazhyev,
Chairman of the Management Board
Tel./ Fax:: +7 (7172) 31-95-22/ 97-04-55 Web-site: www.kegoc.kz
Transport
·      Kazakhstan Temir Zholy (Railroad)
Askar Mamin,
Chairman of the Management Board
Contact center: +7 (7172) 93-01-13 Web-site: www.railways.kz
·      Air Astana JSC
Peter Foster, President
Tel./ Fax:: +7(727) 258 41 35 / 259 87 01 Web-site: www.airastana.com
·      International Airport Atyrau
Dmitry Pak,
Chairman of the Management Board
Tel./ Fax:: +7 (7122) 209 251 / 209 415 Web-site: www.atyrauairport.com
·      International Airport Aktobe
Bogezhan Amanbayev,
Chairman of the Management Board
Tel./ Fax:: +7 (7132) 228005 / 228037 Web-site: www.airport-aktobe.kz
·      Airport Pavlodar
Vladimir Yudin,
Chairman of the Management Board
Tel./ Fax:: +7 (7182) 491271 / 491271 Web-site: www.airport.pvl.kz
Telecom
·      Kazakhtelecom
Kuanyshbek Yesekeev,
Chairman of the Management Board
Tel./ Fax:: +7 (7172) 58 06 59 / 58 77 24 Web-site: www.telecom.kz
·      Kazpost
Arken Arystanov,
Chairman of the Management Board
Tel./ Fax:: +7 (7172) 580296 / 333344 Web-site:www.kazpost.kz
Machinery
·      Kazakhstan Engeneering
Bolat Smagulov,
Chairman of the Management Board
Tel./ Fax:: +7 (7172) 611901 / 611915 Web-site:www.ke.kz
Pharmacy
·      SK-Pharmaceuticals
Nazarbek Beysen,
Chairman of the Management Board
Tel./ Fax:: +7 (7172) 57 13 07 / 57 12 85 Web-site: www.sk-p.kz
Chemicals
·      United Chemical Company LLP
Dauren Yerdebay,
Chairman of the Management Board
Tel./ Fax:: +7 (7172) 689666 Web-site: ucc.com.kz
Nuclear
·      Kazatomprom
Vladimir Shkolnik,
Chairman of the Management Board
Tel./ Fax:: +7 (7172) 55 13 98 / 55 13 99 Web-site: www.kazatomprom.kz



Saturday, September 28, 2013

Region: CIS. Country: Kazakhstan. Business: O&G. Field: Karachaganak. Operator: KPO. Karachaganak – Phase 3.


This week, I will introduce KPO. It is a promising prospect for a Gas treatment companies. However, you have to be patient and persistent as Gas industry in Kazakhstan is highly geopolitical.


Operator: KPO (BG and ENI)
Shareholders: BG (29.25) ; ENI (29.25) ; Chevron (18) ; Lukoil (13.5) ; KMG (10)
Production: Oil 200 000 bpd – Gaz 650 Mcfpd
KPO. The deposit area is 280 km2, and its reserves are estimated at more than 1.2 billion tons of oil and condensate and over 1.35 trillion m3 of gas.

1. A Karachaganak future development group: EPC/EPCM: Fluor, WorleyParsons, and KGNT are interested.         
A vendor assessment process. The process is aiming to assess and to qualify contractors and services providers. You have to be registered to be invited.     
Scope of the project. Gas condensation facilities.  Gas treatment. Increase of production and additional injection and related facilities. If the GOK is willing to use the gas for domestic uses, some related facilities treatments are needed, as well.
FEED is expected for the 4th Qr of 2013.
In 2014, Kazakhstan plans to invest $ 3.7 billion to build a power plant for the processing of natural gas from the Karachaganak field to supply gas to the domestic market
In 2017, the plant will supply gas to Astana and northern regions of Kazakhstan (according to KMG)
It is also expected, that there will be an increase in supply in 2019-2021 to 5 billion cubic meters.
The Ministry of Oil and Gas of Kazakhstan intends to negotiate with Russia on a JV based on the Orenburg gas processing plant, which imports gas from Karachaganak.   

2. Ongoing Projects. Ongoing project, mainly Brownfield and medium size projects.
The plateau Extension project. KPC gas bottle necking. Scope: improve gas treatment capability power facilities and gas improvement system.
Gas injection upgrade. The technical solution related to this phase is not established yet.  The issue is how to use the existing facilities to inject more gaz.

Let me know your questions ... and if you may need support, contacts details and how to navigate through the management structure. 

And Good Luck !


Thursday, September 19, 2013

Next Week Post: The phase 3 of Karachaganak Petroleum Operating (KPO – 20BUS$).

Friday September 27th, you will be introduced to the phase 3 of the Karachaganak Petroleum Operating (KPO – 20BUS$) projects. The phase 3. 
  • Operator: KPO (BG and ENI)
  • Shareholders: BG (29.25) ; ENI (29.25) ; Chevron (18) ; Lukoil (13.5) ; KMG (10)
  • Production: Oil 200 000 bpd – Gaz 650 Mcfpd 



Let me know your comments, questions ...